国产一卡2卡三卡4卡免费网站_一本久久a久久精品综合麻豆_亚洲欧洲成人精品AV97_GV无码免费无禁网站男男_久久久久久A亚洲欧洲AV_亚洲AV综合色一区二区三区

News Center
Position:Home > News Center > DFE News
State Grid’s First PDN Distributed Low-frequency and Low-voltage Equipment, participated in by DFE, Put into Running in Laiwu District of Jinan
Pubdate:2023-02-17
  |  
Article From:
Font size:
A+ A- A

State Grid’s First PDN Distributed Low-frequency and Low-voltage Equipment Put into Running in Laiwu District of JinanState Grid’s First PDN Distributed Low-frequency and Low-voltage Equipment Put into Running in Laiwu District of Jinan

 “10KV Changming Line #1 Ring Main Unit Distributed Low-frequency and Low-voltage Equipment’s 3rd round of low-frequency action is correct, and the data uploading succeeds.” On February 14, State Grid Laiwu Power Supply Company’s smart grid dispatching and control system received the signal, marking State Grid’s first PDN distributed low-frequency and low-voltage equipment, participated in by Dongfang Electronics Corporation (DFE), has got through debugging and officially come into pilot running. 

Amid the backdrop that distributed PV has been massively put into running in recent years, 10KV power distribution lines frequently encountered inverse power transmission problem at noon time, so that load shedding amount in low-frequency and low-voltage load shedding scheme fails to meet system requirements. If smart low-frequency and low-voltage equipment that can discriminate power direction is installed at the transformer substation, it can rule out the likelihood of erroneous load shedding at the time of inverse supply, but it is unable to fundamentally raise load shedding amount.

Laiwu Power Supply Company, based on the principle “Realistic and Pragmatic, Addressing both Symptoms and Root Cause”, stressed precise load control and developed PDN distributed low-frequency and low-voltage equipment in conjunction with DFE. According to real conditions, it developed two modes of equipment and made use of optical cable or wireless 5G communication, living up to adaptation to local condition and quick rise of the third defense line’s load shedding level. Regarding the two modes, the first one is integration of low-frequency and low-voltage load shedding feature with ring main unit and pole-mounted distribution automation terminal. As a result, the upgrading and revamping is simple, and communication path keeps unchanged, which facilitates quick popularization and application; the second one is installation of separate distributed low-frequency and low-voltage equipment at ring main unit and pole-mounted switch, which facilitates  matchmaking with aviation connector, and the equipment is small-sized and reliable. Laiwu Power Supply Company has installed two modes of distributed low-frequency and low-voltage equipment at 10 KV Changming Line #1 ring main unit, 10 KV Xiangshan Line Xiyu Branch Line #5 ring main unit, and 10 KV Fangxing Line #12 pole-mounted section switch respectively. It adopted wired and 5G communication, and discriminated load for the people’s livelihood from the load for industry and commerce while preserving distributed PV output support. That helps ensure precise load shedding, tap load shedding potential to the maximum extent, realize all-around monitoring in the energy management system, and guarantee safety of the power grid’s third defense line.

With massive grid connection of distributed power supply, active power distribution network(PDN) brings about low-frequency and low-voltage load shedding measures’ approaching to lower safety limit. In view of this, DFE assisted Laiwu Company in making active explorations and embarking on Early and Pilot Implementation, in order to proactively shatter technical problem resulting from massive grid connection of distributed power supply. In the future, DFE will further contribute to development of new-type power system, keep expanding distributed low-frequency and low-voltage equipment application scenarios, quickly popularize use of the equipment in different scenarios (including important user line, hybrid line of various load natures, industrial user power distribution room connecting with distributed PV), and ensure safe and steady running of the power grid.

主站蜘蛛池模板: 激情综合婷婷丁香五月 | 911精产国品一二三区在线观看 | 国产伦精品一区二区三区四区视频_ | 国产超碰人人做人人爽av大片 | 好黄好硬好爽免费视频一 | 麻豆传媒一区二区三区 | 亚洲AV成人无码精品综合网站 | 国产免费AV片在线播放唯爱网 | 中文字幕人妻被公上司喝醉506 | 久久人人爽人人爽人人片亞洲 | 亚洲国产精品日韩AV专区 | 乱人伦精品视频在线观看 | 国产精品嫩草影院免费 | 人禽杂交18禁网站免费 | 久久久久中文伊人久久久 | 亚洲日本va午夜中文字幕久久 | 色噜噜日韩精品欧美一区二区 | 日本在线视频网址 | 永久免费av无码网站韩国毛片 | 欧美综合自拍亚洲综合图片区 | 红杏成av人影院在线观看 | 成人午夜国产内射主播 | 国语精品91自产拍在线观看二区 | 亚洲中文字幕日产无码 | 欧美性猛交xxxx乱大交be | 国产精品理论视频 | 天堂中文最新版在线官网在线 | 欧美一进一出抽搐大尺度视频 | 国产一级成av人片在线观看 | 女女久久| 国产综合久久一区二区三区 | 久久在精品线影院精品国产 | 国产成年女人毛片80s网站 | t∨澳门黄不让成人在线无码视频 | 国产天天骚 | 无码天堂亚洲国产AV久久 | 国产一区国产二区在线观看 | 欧美私人家庭影院 | 日韩视频在线一区二区 | 日本XXXWWW在线观看 | 少妇被躁爽到高潮无码文 |